Classic SAP example from BOMMAT
A table contains references to other objects. These are to be copied to a reference attribute in PIM.
Procedure
-
Activate the “Fill from table” option for the attribute.
-
Select the table attribute and the individual attribute from the table as the source attribute.
-
If several values in the table are to be copied into one attribute, enter the desired separator.
-
Activate “Ignore early return”. This function prevents the search from being aborted after the first search result.
-
Select the attribute in the Staging table attribute that contains the external key for the table row.